Estimation And Costing In Civil Engineering Mcq Pdf

  • and pdf
  • Wednesday, May 26, 2021 5:51:13 AM
  • 4 comment
estimation and costing in civil engineering mcq pdf

File Name: estimation and costing in civil engineering mcq .zip
Size: 26196Kb
Published: 26.05.2021

Solved examples with detailed answer description, explanation are given and it would be easy to understand. Here you can find objective type Civil Engineering Estimating and Costing questions and answers for interview and entrance examination. Multiple choice and true or false type questions are also provided. You can easily solve all kind of Civil Engineering questions based on Estimating and Costing by practicing the objective type exercises given below, also get shortcut methods to solve Civil Engineering Estimating and Costing problems. A portion of an embankment having a uniform up-gradient 1 in is circular with radius m of the centre line.

Estimating-and-costing MCQ

Get your score and actual answers at the end of this quiz. Pick up the excavation where measurements are made in square metres for payment.

Ordinary cuttings up to 1 m. Surface excavation up to 30 cm depths. Both B and C. The expected out turn of 2. A portion of an embankment having a uniform up-gradient 1 in is circular with radius m of the centre line. It subtends ? If the height of the bank is 1 m at the lower end, and side slopes , the earth work involved. The order of booking dimensions is. Length, breadth, height. Breadth, length, height. Height, breadth, length. None of these.

As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken. All the above. Pick up the item of work not included in the plinth area estimate. Courtyard area.

Room area. Verandah area. Pick up the correct statement from the following:. The bent up bars at a support resist the negative bending moment. The bent up bars at a support resist the sharing force. The bending of bars near supports is generally at 45? The brick work is measured in sq metre, in case of.

Honey comb brick work. Brick flat soling. Half brick walls or the partition. Brick walls are measured in sq. In case of laying gullies, siphons, intercepting traps, the cost includes. Setting and laying. Bed concreting. Connection to drains. All of these.

In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and. The height of the sink of wash basin above floor level is kept. While preparing a detailed estimate.

Dimension should be measured correct to 0. Area should be measured correct to 0. Volume should be measured correct to O. The concrete work for the following part of the building of specified thickness is measured in square metres.

Root Slabs. The expected out turn of cement concrete 1 : 2 : 4 per mason per day is. The plinth area of a building not includes. For 12 mm thick cement plastering 1 : 6 on sq. The minimum width of a septic tank is taken. The item of the brick structure measured in sq. Reinforced brick work. Broken glass coping. Brick edging. Brick work in arches. The item of steel work which is measured in sq. Collapsible gates. Rolling shutters. Steel doors.

If God did not build it.. Civil Engineers did it..!! This site uses cookies to give you best and most relevant experience. Find out more. Okay, thanks.

Civil Engineering - Estimating and Costing

Mechanical Engineering 1. MCQ Practice Tests. Timed Mock Tests. Online Quizzes. Technical Terms.


Design of Steel Structures Civil Engineering MCQ and Answers - Set Practice Test: Question Set - 01 1. Select the correct statement (A) Material cost of a.


300+ TOP ESTIMATING & COSTING Multiple Choice Questions Answers

Answer: Option B electrical estimation and costing notes pdf, needed, an ability to assess and estimate, and ev en the cour age to write down the technical quantities and figures. Tagged damp proof course, detention period, estimating and costing mcq pdf download, estimation, estimation and costing mcq pdf, estimation and costing mcqs, estimation costing and valuation mcq. The estimated cost is the anticipated or probable cost of the work and is usually prepared before the construction is taken up.

Estimation and Costing Interview Questions Free Online Practice Test

Questions Answers Civil Engineer. Sapphire Home Civil Engineer.

 - Он постарался ее успокоить, входя вслед за ней в комнату заседаний к закрытому жалюзи окну.  - Пусть директор разбирается. Она посмотрела ему в .

 - Открылся третий уровень защиты! - Люди в комнате засуетились. На экране агент с короткой стрижкой безнадежно развел руками. - Сэр, ключа здесь. Мы обыскали обоих. Осмотрели карманы, одежду, бумажники.

Сьюзан пришлось сделать крюк, притворившись, что она направляется в туалет. Нельзя, чтобы Хейл что-то заподозрил. ГЛАВА 43 В свои сорок пять Чед Бринкерхофф отличался тем, что носил тщательно отутюженные костюмы, был всегда аккуратно причесан и прекрасно информирован. На легком летнем костюме, как и на загорелой коже, не было ни морщинки.

 Он был крайне со мной любезен, - просияв, сказал Бринкерхофф, довольный тем, что ему удалось остаться в живых после телефонного разговора.  - Он заверил меня, что ТРАНСТЕКСТ в полной исправности.

4 Comments

  1. Eneida C. 28.05.2021 at 18:30

    The estimated value of the work excluding the amount for contingencies, work charged establishment, tool and plants, is called work value.

  2. Keith S. 29.05.2021 at 06:17

    Based on Historical Cost: Valuation of inventory is made on a conservative basis, i.

  3. France L. 31.05.2021 at 19:07

    Last Updated on October 5, by Admin.

  4. Eric W. 02.06.2021 at 23:05

    Le corbusier and the architectural promenade pdf the sports coach as educator reconceptualising sports coaching pdf

teeth whitening in esthetic dentistry principles and techniques pdf

Black religion and black radicalism pdf

Metrics details. Dental bleaching in traditional concentrations generates greater sensitivity. In this respect, new systems of lower concentration of hydrogen peroxide for tooth bleaching appeared, with color stability unknown over time.